Project Name : Administrative Core Area Facilities (Hawiyah NGL Recovery Plant) Contract No : 6600012802 Location : Hawiyah, Saudi Arabia Client : Saudi Aramco Construction Period : 36 Months MAC was entrusted by Saudi Aramco, the LSTK Contract to design, procure and build all buildings and facilities for their new Hawiyah NGL Recovery Plant Administrative Core Area (ACA). Work consisted of executing all Civil, Structural and Architectural Works; Site Grading, Roads, Paving, Landscaping and Fencing Works; all Infrastructure Works; such as, Water Supply, Sanitary Sewer, Oily Water Sewer, Storm Water Drainage, Ponds and Sewage Lift Station; Electrical; Fire Detection/Protection; Communication System; Plumbing; and Furnishing, as well as, all other Systems necessary to hand over the facilities, complete and fully operational.
Since the ACA Facilities Project was part of the Main Hawiyah NGL Recovery Plant Project, MAC had to coordinate with several other contractors to ensure smooth execution and timely completion of the Project.
The PROJECT consisted of the following:
1,950 square metres of offices and conference room made of steel frame and pre-cast concrete panels
3,500 square metres Pre-engineered structural steel building including metal storage racks
1,980 square metres Pre-engineered steel building including a conference room, audio & video projection systems and equipment
1,100 square metres pre-engineered steel building including shop equipment and a fenced lay down yard