Scope
The civil work included:
  • Earthmoving, grading, excavation and backfilling of the site in general, as well as special excavation work for cable trenches and concrete foundations.
  • Construction of burnpits.
  • Construction of reinforced concrete underground pipework trenches.
  • Excavation and backfilling for an extensive underground piping network.
  • Site fabrication, installation and testing of ductile iron and FRP underground piping.
  • Construction of reinforced concrete foundations, slabs, culverts, manholes and valve boxes.
  • Construction of buildings, including main power sub-stations P1 and P2, sub-station P3, control building, laboratory and standby generator building, maintenance shelter, chemical store and personnel shelters.
  • Fireproofing of structural steel columns and beams.
  • Laying of more than 150,000 square metres of concrete paving, asphalt paving and roads.