Home
|
About Us
|
Projects
|
Resources
|
Contact Us
Projects
>
Civil Projects
>
TMA Cargo Terminal
Civil Projects
115-KV Sub-Stations
Administrative Core Area Facilities
Al-Khobar II Power Plant
Armed Forces Hospitals
AUB Medical Centre
Autoworld Facilities
Khurais Crude Facilities - Buildings
Khurais Crude Facilities - Civil Works
Extension & Modification of the SISP
GTC Civil & Building Works
MTBE I Plant
MTBE II Plant
Onshore Gas-Gathering
Residential & Industrial Complex
TMA Cargo Terminal
TMA Jet Hangar
Water Pipeline Sub-Stations
Wire Drawing Factory
Yamama Cement Plant
Civil Projects in PDF
Scope
The project included the demolition of the previous facility and the modification of an existing warehouse building to use as administrative offices and pilot-training simulator facilities with complete communications and control system.
Two structural steel cargo warehouses (each with an area of 5,000 square metres) were designed and built to accommodate transient cargo to various parts of the Middle East. The roof structure consisted of lightweight steel trusses and lightweight roof panels, thus achieving minimum column loading.
The third stage included the construction of a cast-in-situ post-tensioned concrete warehouse having a roof system spanning 60 metres and 50 metres deep to house a state-of-the-art cargo-handling, transport, sorting and storage system. The 15-centimetre concrete slab for the roof was carried by several drop beams (with cross sections of 2x2 and 2x1 metres). These beams were post-tensioned with a number of 1/2-inch bundled strands in a polyethylene sheathing 60 metres long and an Atlas tensioning system. The tensioning of these massive beams was very delicate, considering their lengths. A special high strength concrete mix free of chlorides was used.
The whole area was then landscaped with special green areas and pedestrian zones as well as traffic lanes.