The facilities were designed to collect gas which was wastefully burning off into the atmosphere. On construction, the plant enabled the gas to be purified and then compressed in 16 large compressors, ranging from 17,000 to 21,000 hp. It was then piped to Jubail, some 150 kilometres to the south, where it was put to commercial use, thus achieving substantial economic and ecological gains.
MAC Construction was also responsible for the installation and on-site operation of a project material management system using a Hewlett Packard 3000 computer system.
The mechanical/electrical work included: