This
project involved the construction (including complete supply of materials)
of three 115/13.8 KV 30/40 MVA outdoor-type sub-stations situated along
the main DhahranRiyadh highway, with the modification of an additional
seven satellite electrical sub-stations at locations throughout the Eastern
Province. These were designed to provide power for the booster pump stations
of the 500-kilometre pipeline through which desalinated water is pumped
from Jubail (in the Eastern Province) to the capital, Riyadh.
|